The design allows for peg boards and anchor points.
Also is a sealed area with air control for camera repair and watchmaking.
Another area is the darkroom and custom wet area for 8x10 and color work. With room for storage of course.
This will also need a new draining system and 220V power. The welding area will need a new door and some concrete installed.
No comments:
Post a Comment